IranTalent Products
IranTalent
Kardix
Reports
salary benchmarking
Blog
Tests
Tracking system
Sarvak Azar Engineering and Development (SAED)
5
Overview
Jobs
Review
Website:
CEO:
Establishment Year:
Industry:
-
Company Size:
100-499 employees
Location:
,
Address:
قیطریه- بلوار کاوه شمالی- خیابان روشنایی- خیابان بهار شمالی- بن بست جلیل زاده- پلاک11
Location of Sarvak Azar Engineering and Development (SAED) is not marked on the map.
The “Buyback Service Contract” for Development of Azar Oil Field was signed between National Iranian Oil Company (NIOC) and a Consortium consisting of Oil Pension Fund Investment Company (OPIC) and Oil Industries’ Engineering and Construction (OIEC) in dated 18th March 2012. Subsequently, with NIOC approval, execution of the Contract was assigned to newly established company, Sarvak Azar Engineering and Development (SAED) in 09th July 2012. The company’s objectives are implementation/execution of project within defined time schedule and budget as per Master Development Plan (MDP) and achieve 65,000 BOPD production. SAED’s Goals Development of Azar Common Oil Field and compilation of Enhanced Oil Recovery (EOR) program. Project execution within proposed Schedule and Budget. Emphasizing on Health, Safety and Environment (HSE) regulations, with maximum utilization of Iranian (Local Content) technical, engineering and manufacturing capabilities. Planning to increase the production rate to one hundred thousand barrels for the second phase of field development.
Recommended Job:
Head of Accounting
Afra Ofogh Zhiar (AOZ)
eCommerce Operations Specialist
Citron Automation
Quality Assurance Manager
Goroh Sanati Noavaran Abri
Sales Supervisor
Aron groups
Senior Copywriter
Dana Energy
Systems And Methods Manager
Avakatan