● Design of high pressure or low-pressure section of power substations.
● Installation of electrical pumps.
● Check the status of contractors.
● Working hours: from 8 am to 5 pm; In terms of half an hour as a buoy.
Requirements
● Bachelor's or Master's degree in Electrical Engineering.
● Minimum one year to a maximum of 15 years of work experience.
● Have experience designing high-pressure substations or electrification to industrial plants.